NW Gourmet Freezer Addition, Renton, WA

20191002_075452

Constructed a 6,386 Square Foot freezer expansion to an existing operation food warehouse facility.  This was done with structural steel and Insulated Metal Panel construction and was performed on schedule while working around the owner's operational truck dock facility in the immediate area.  Project included Civil, Structural, Architectural, Mechanical, and Electrical tie-ins and included condensing units design and install and an in-floor glycol system.

Leave a Comment