Dahlgren Industrial was contracted to coordinate, and install, a new intake hood on the Darigold Lynden Dryer 88 along with structural upgrades.  All work had to be completed within a 10-hour plant shutdown period and included the removal of existing HVAC, cutting of IMP wall penetrations, rigging, setting, and welding on a new 8,000 lb. support platform, and rigging and installing a new hood at 64’ elevation.  Work was completed within the scheduled time period while simultaneously completing steam and condensate upgrades.