CDFSW Wastewater Treatment Plant

Dahlgren Industrial recently completed a $136MM Dairy facility in Littlefield TX that included all the design and construction of stormwater throughout at 26-acre site.  This included all of the numerous catch basins, scale pit drains, lift stations, and manholes; including those made of fiberglass and concrete as well as metering manholes. Much of this work was self-performed and completed on budget and schedule.

Leave a Comment