17-45 Tank AA19 Replacement

This project involved fabricating a new stainless-steel tank with a new KCC coating for replacement of the existing tank, AA19. Dahlgren preformed all rigging for removal of the existing, and placement of the new tank. New utilities installed included CPVC and stainless-steel piping as well as installation of existing components such as anode and cathode plates and all instrumentation required. The removal and installation all occurred over a three-week shutdown period during the December holiday break.